1 comment on “Tram bridge

  1. We need to get the bridge repaired or replaced as soon as possible. I used to use the bridge as part of my cycle to work. Since it was closed I have found it much harder to cycle to work which puts me off doing it. The small path by the side of the river is not a suitable alternative as I have on a number of occasions seen near misses between pedestrians and cyclists. If we want to improve our air quality, reduce road congestion, and reduce climate change we need to do everything possible to encourage people to walk and cycle more and this bridge is one of the key assets for helping with this for anybody coming into the the city from Bamber bridge, Chorley, and Leyland.

Please enter a comment
Please enter your name